Advertisements


 

 

INVITATION FOR TENDERS

Sl No

Name of work

Selling period Closing date/time Opening date/time Security money

Tenderer

199X Repair and maintenance of Jessore Airport during the year 2009-2010 (S.H.- re-excavation of kutcha drain at both side of runway) 21/03/2010 during office hrs 22/03/2010 at 1200 hrs 22/03/2010 at 1230 hrs Tk5,000/- Executive Engineer, Civil Division-3, CAAB
198X শাহ্ মখদুম বিমানবব্দর রাজশাহীর রানওয়ের পূর্ব পার্শ্বের ঘাস ও জঙ্গল কেটে পরিষ্কার করন কাজ 21/03/2010 during office hrs 22/03/2010 at 1200 hrs 22/03/2010 at 1230 hrs Tk1,900/- Airport Manager, Shah Mukhdum, Rajshahi
197X R.M.O. E/M works service at Saidpur Airport during the year 2009-2010 (S.H.- Procurement of low pressure and high pressure fittings and spare parts) 21/03/2010 during office hrs 22/03/2010 at 1200 hrs 22/03/2010 at 1230 hrs Tk5,200/- Executive Engineer, Civil Division-3, CAAB
196X Improvement of drainage system at Airside of Hazrat Shahjalal International airport, Re-digging of cannel and leveling dressing from VVIP South side gate towards south up to 1802"-00") at Hazrat Shahjalal International Airport, Dhaka. 18/03/2010 up to 1200 hrs 21/03/2010 at 1200 hrs 21/03/2010 at 1230 hrs Tk.27,000/- Superintending Engineer (CC), Civil Circle, CAAB
195X R.M.O. E/M works service at Shah Mokhdum Airport, Rajshahi during the year 2009-2010 (S.H.-wiring of new guard room of DVOR other related works) 23/03/2010 during office hrs 24/03/2010 at 1200 hrs 24/03/2010 at 1230 hrs Tk5,000/- Executive Engineer E/M Division-3, CAAB
194X Repair and maintenance of Osmani International airport, Sylhet during the year 2009-2010 (S.H.- Emergency work-Kutcha and pucca drain system in/c other allied work passenger terminal building to fire station) 21/03/2010 during office hrs 22/03/2010 at 1200 hrs 22/03/2010 at 1230 hrs Tk8,500/- Executive Engineer, Civil Division-3, CAAB
193X Supply of energy saving Lamp for E/M-I 28/03/2010 29/03/2010 at 1200 hrs 29/03/2010 at 1215 hrs Tk5,000/- Director, CEMSU, CAAB
192X Development of 400 KVA electrical sub-station, providing and installation of H.T switchgear with related works at Jessore Airport (S.H.- Installation of H.T. Metering panel unit with L.T. P.T. H.T. Cable for HT connection with related works 21/03/2010 during office hrs 22/03/2010 at 1200 hrs 22/03/2010 at 1230 hrs Tk10,700/- Executive Engineer E/M Division-3, CAAB
191X R.M.O. E/M works service at Jessore Airport during the year 2009-2010 (S.H.- Repairing & maintenance of 10 HP water pump and replacement of Auto Starter i/c other works) 23/03/2010 during office hrs 24/03/2010 at 1200 hrs 24/03/2010 at 1230 hrs Tk2,500/- Executive Engineer E/M Division-3, CAAB
190X Supply of Brand New latest model Bus & Microbus for CAAB 23/03/2010 24/03/2010 at 1200 hrs 24/03/2010 at 1215 hrs Tk1,40,000/-L-1 Tk1,35,000/-L-2 Director, CEMSU, CAAB
189X Construction residential building, School and over head tank in/c E/M work (S.H.- construction of 6 unit G-type quarter at Jessore Airport (Group-B) 28/03/2010 during office hrs 30/03/2010 at 1200 hrs 30/03/2010 at 1230 hrs Tk1,80,500/- Superintending Engineer (CC) P&D/QS Circle, For- Chief Engineer,  CAAB
188X Construction residential building, School and over head tank in/c E/M work (S.H.- construction of 6 unit G-type quarter at Jessore Airport (Group-A) 28/03/2010 during office hrs 30/03/2010 at 1200 hrs 30/03/2010 at 1230 hrs Tk1,80,500/- Superintending Engineer (CC) P&D/QS Circle, For- Chief Engineer,  CAAB
187X Construction of security wall at both sides of runway at Jessore Airport (S.H.- Construction of Security wall at east  side of runway) 21/03/2010 during office hrs 25/03/2010 at 1200 hrs 25/03/2010 at 1230 hrs Tk4,20,000/- Superintending Engineer (CC) P&D/QS Circle, For- Chief Engineer,  CAAB
186X R.M.O. E/M works service at Shah Amanat International Airport, Chittagong during the year 2009-2010 (S.H.- Reconstruction of transformer pit & painting of runway lighting system) 21/03/2010 during office hrs 22/03/2010 at 1200 hrs 22/03/2010 at 1230 hrs Tk5,000/- Executive Engineer E/M Division-3, CAAB
185X R.M.O. E/M works service at Osmani International Airport during the year 2009-2010 (S.H.- Rewiring of different types of residential quarter-6 unit P5 quarter (P5 1 to 6) with related works) 21/03/2010 during office hrs 22/03/2010 at 1200 hrs 22/03/2010 at 1230 hrs Tk6,000/- Executive Engineer E/M Division-3, CAAB
184X R.M.O. E/M works service at Jessore Airport during the year 2009-2010 (S.H.-Rewiring of rest house & repairing maintenance of fitting fixture i/c other works) 24/03/2010 during office hrs 25/03/2010 at 1200 hrs 25/03/2010 at 1230 hrs Tk3,800/- Executive Engineer E/M Division-3, CAAB
183X

R.M.O. E/M works service at Barisal Airport during the year 2009-2010 (S.H.- Procurement  of 400/90 watt sodium flood light fittings lamp, choke, starter, magnetic contractor etc)

24/03/2010 during office hrs 25/03/2010 at 1200 hrs 25/03/2010 at 1230 hrs Tk2,500/- Executive Engineer E/M Division-3, CAAB
182X R.M.O. E/M works service at Barisal Airport during the year 2009-2010 (S.H.- Procurement and installation of 2 nos split type A/C machine for VVIP and control tower i/c other related works) 24/03/2010 during office hrs 25/03/2010 at 1200 hrs 25/03/2010 at 1230 hrs Tk7,500/- Executive Engineer E/M Division-3, CAAB
181X Repair and maintenance of communication equipment & supply of different type materials for Cox's Bazar Airport 14/03/2010 up to office  hrs 15/03/2010 at 1200 hrs 15/03/2010 at 1230 hrs Tk1,650/- Airport Manager, Cox's Bazar, CAAB
180X Expired --- --- --- --- ---
179X হযরত শাহজালাল আন্তর্জাতিক বিমানবন্দরের কাষ্টমস হাউজের পশ্চিম পার্শ্বে কার্গো কার পার্কে প্রবেশকৃত যানবাহনের ফি আদায়ের নিমিত্তে ইজারা গ্রহণে ইচ্ছুক ব্যক্তি/প্রতিষ্ঠান/সংস্থার নিকট হইতে ইজারা দরপত্র আহ্বান করা যাইতেছে 29/03/2010 up to 1700 hrs 30/03/2010 at 1200 hrs 30/03/2010 at 1230 hrs

10% of the quoted amount per year

Director (ATS & Aero), CAAB.
178Xa) R.M.O. Building during the year 2009-2010 (S.H.- Emergency repairing of water service line in/c renovation of sewerage system, pucca surface drain and arboriculture work to flower garden area of CATC Principal office building & otherallied works) at Hazrat Shahjalal International Airport, Kurmitola, Dhaka. 18/03/2010 up to 1200 hrs 21/03/2010 at 1200 hrs 21/03/2010 at 1230 hrs Tk25,000/- Superintending  Engineer (CC), Civil Circle, CAAB
b) -do- (S.H.- Providing garden bed in/c beautification and other allied works to west side of CATC Principal office) at Hazrat Shahjalal International Airport, Kurmitola, Dhaka. -do- -do- -do- Tk13,500/- -do-
177X R.M.O. Building during the year 2009-2010 (S.H.-Renovation of main gate and car park to south side of CATC Zam-e-mosque) at Hazrat Shahjalal International Airport, Kurmitola, Dhaka. 23/03/2010 up to 1200 hrs 25/03/2010 at 1200 hrs 25/03/2010 at 1230 hrs Tk25,000/- Superintending Engineer (CC) Civil Circle, CAAB
176X Improvement of drainage system airside of Hazrat Shahjalal International Airport. Re-diggining of cannel and leveling dressing from Cargo village entry gate towards west up to north taxiway) at HSIA, Kurmitola, Dhaka 21/03/2010 up to 1200 hrs 23/03/2010 at 1200 hrs 23/03/2010 at 1230 hrs Tk26,000/- Superintending Engineer (CC) Civil Circle, CAAB
175X Re-construction of Apron at Hazrat Shahjalal International Airport (S.H.-Re-construction of damaged slab of Passenger Apron  Bay no02 front side) at HSIA, Kurmitola, Dhaka 25/03/2010 up to 1200 hrs 28/03/2010 at 1200 hrs 28/03/2010 at 1230 hrs Tk1,85,000/- Md. Shahidul Afroz, For Chief Engineer, CAAB
174X Re-construction of Apron at Hazrat Shahjalal International Airport (S.H.-Re-construction of damaged slab of Passenger Apron in between Bay no08 and Bay no 09 front side) at HSIA, Kurmitola, Dhaka 25/03/2010 up to 1200 hrs 28/03/2010 at 1200 hrs 28/03/2010 at 1230 hrs Tk2,75,000/- Md. Shahidul Afroz, For Chief Engineer, CAAB
173X R.M.O. Building during the year 2009-2010 (S.H.-Essential repair & maintenance of boundary wall with providing M.S. grill in front side of CATC Admin complex building) at Hazrat Shahjalal International Airport, Kurmtiola, Dhaka 18/03/2010 up to 1200 hrs 21/03/2010 at 1200 hrs 21/03/2010 at 1230 hrs Tk25,000/- Superintending  Engineer (CC), Civil Circle, CAAB
172X Auction sale of different type of un-serviceable vehicles (Jeep, Bus etc) 15/03/2010 during office hrs 16/03/2010 at 1200 hrs 16/03/2010 at 1215 hrs

10% of the quoted auction value

Executive Engineer (CC), Civil Division-3, CAAB
171X Repair and maintenance of Shah Makhdum Airport, Rajshahi during the year 2009-2010 (S.H.- Repairing & Maintenance of Anser Barrack) 17/03/2010 during office hrs 18/03/2010 at 1200 hrs 18/03/2010 at 1230 hrs Tk5,100/- Executive Engineer (CC), Civil Division-3, CAAB
170X Repair and Maintenance of Shah Makhdum Airport, Rajshahi  during the year 2009-2010 (S.H.- Repairing painting and maintenance of passenger terminal building in/c other allied works) 17/03/2010 during office hrs 18/03/2010 at 1200 hrs 18/03/2010 at 1230 hrs Tk8,500/- Executive Engineer (CC), Civil Division-3, CAAB
169X O&M of B&R work services at Shah Makhdum Airport, Rajshahi during the year 2009-2010(S.H.- Providing walkway from Passenger Terminal Building to NDB in/c other allied works) 17/03/2010 during office hrs 18/03/2010 at 1200 hrs 18/03/2010 at 1230 hrs Tk2,500/- Executive Engineer (CC), Civil Division-3, CAAB
168X Providing & Installation of major spare parts of conveyor belt & weighing scale (S.H.-Providing & installation of 2 nos, carousel conveyor belt at Shah Amanat International Airport, Chittagong) 15/04/2010 15/04/2010 at 1200 hrs 18/04/2010 at 1230 hrs US$13,600.00 Superintending Engineer (CC), P&D/QS Circle  For- Chief Engineer, CAAB
167X R.M.O. E/M works service at Cox's Bazar Airport during the year 2009-2010 (S.H.- Providing and installation of 90 watt LP Sodium street light with pole, LT/UG Cable with related work from power house panel to Approach road NDB Hut area) 23/03/2010 during office hrs 24/03/2010 at 1200 hrs 24/03/2010 at 1230 hrs Tk2,700/- Executive Engineer, E/M Division-3, CAAB
166X R.M.O. E/M works service at Jessore Airport during the year 2009-2010 (S.H.- Procurement of different types of Lamps for Air Field lighting system) 24/03/2010 during office hrs 25/03/2010 at 1200 hrs 25/03/2010 at 1230 hrs Tk7,500/- Executive Engineer, E/M Division-3, CAAB
165X R.M.O.  E/M Works service at Jessore Airport during the year 2009-2010 (S.H.-Providing & installation of window air-condition machine for VOR, NDB & ECR i/c other air-condition unit servicing, repairing maintenance works) 23/03/2010 during office hrs 24/03/2010 at 1200 hrs 24/03/2010 at 1230 hrs Tk.3,800/- Executive Engineer E/M Division-3, CAAB
164X R.M.O. E/M works service at Osmani International Airport, Sylhet during the year 2009-2010 (S.H.- Supply of Battery, Battery charger and different types of tools for engine generating sets) 24/03/2010 during office hrs 25/03/2010 at 1200 hrs 25/03/2010 at 1230 hrs Tk7,000/- Executive Engineer, E/M Division-3, CAAB
163X Development of passenger Terminal Building (S.H.- Renovation of Gents & Ladies toilets Ground floor custom hall (South side) PTB-1) at Hazrat Shahjal International Airport, Dhaka 28/03/2010 up to 1200 hrs 31/03/2010 at 1200 hrs 31/03/2010 at 1230 hrs Tk80,000/- Executive Engineer (Civil), For Chief Engineer, CAAB
162X Repair and maintenance of Shah Amanat International Airport, Chittagong during the year 2009-2010-Repair and maintenance of operational road, drainage system, culvert, dressing, leveling (S.H.- Repair and maintenance of Road from gate no 13 to runway-23 end inter section and gate no 13 to Airport maintenance building in/c 23/03/2010 during office hrs 25/03/2010 at 1200 hrs 25/03/2010 at 1230 hrs Tk23,000/- Superintending Engineer (CC), P&D/QS Circle   CAAB

161X

Supply of different type of Air-conditioning Unit for different Airports 15/03/2010 16/03/2010 at 1200 hrs 16/03/2010 at 1215 hrs Tk 40,000/- Director, CEMSU, CAAB
160Xa) O&M of E/M works services at Hazrat Shahjalal International Airport, Dhaka during the year 2009-2010 (S.H.- supply of runway edge elevated type ZA151 light fittings) 15/03/2010 up to 1200 hrs 16/03/2010 at 1200 hrs 16/03/2010 at 1230 hrs Tk 9,000/- Executive Engineer, E/M Division-II, CAAB
b) -do-(S.H.- Emergency unseen supply/work-Supply of consumable materials & Low Pressure Sodium Lamp & other spare for Middle Marker & NDB Area at HSIA) -do- -do- -do-

Tk.8,000/-

-do-
c) -d0-(S.H.- Supply of magnetic Contactor, module etc. at Transmitting station) -do- -do- -do- Tk8,000/- -do-
d) -do-(S.H.-Supply of Switch socket, bulb, holder, fan capacitor, fan bearing, circuit breaker, consumables etc. at Tejgaon, Banani R/A & other station) -do- -do- -do- Tk5,500/- -do-
e) -do- (S.H.- Raising the Taxiway Stop bar Light fittings base i/c fitting/fixing & other related works) -do- -do- -do- Tk4,500/- -do-
159X Construction of new residential quarters (Chairman & Member's Banglo), D-type, E-type, F-type & H-type quarters (S.H.-Construction of 200 uits U-type Semi-pucca unclassified quarters at  Irshal Colony, Kurmtiola, Group-2 nos. Building -8-Units - Internal electrification works of Group P+ R+ S) 23/03/2010 up to 1200 hrs 24/03/2010 at 1200 hrs 25/03/2010 at 1230 hrs Tk 22,500/- Superintending Engineer (CC), E/M Circle, CAAB
158Xa) O&M of E/M work services at Hazrat Shahjalal International Airport, Dhaka during the year 2009-2010 (S.H.- Supply of 200 watt & 100 watt 6.6 amps T.H Lamp for runway, H.I. & Supplementary Approach & Wing bar Threshold Lighting System) 16/03/2010 up to 1200 hrs 18/03/2010 at 1200 hrs 18/03/2010 at 1230 hrs Tk8,500/- Executive Engineer, E/M Division-II, CAAB
b) -do-( S.H.- Repairing of light base anchor nuts bolts for fixing up the security case over the Isolating Transformer pit of runway lighting system) -do- -do- -do- Tk 7,000/- -do-
c) -do- (S.H.- Supply of Consumable materials for runway lighting system) -do- -do- -do- Tk 4,000/- -do-
157Xa) O&M of E/M work services at Hazrat Shahjalal International Airport, Dhaka during the year 2009-2010 (S.H.- Supply, installation, testing & commissioning of 250KVA Automatic Voltage Stabilizer (AVR) in the submersible water pump house installed at BFC area i/c other related works) 16/03/2010 up to 1200 hrs 18/03/2010 at 1200 hrs 18/03/2010 at 1230 hrs Tk25,000/- Superintending Engineer (CC), E/M Circle, CAAB
b) -do- (S.H.- Repairing / servicing of 100KVA Disel Engine Generating set at Transmitting Station Power House) -do- -do- -do- Tk21,000/- -do-
156Xa) O&M of Passenger Terminal Building-1 & Domestic T/B at Hazrat Shahjalal International Airport, Dhaka during the year 2009-2010 (S.H.-Repairing & replacement of double tube light fittings i/c related works at Domestic T/B & TB-1 15/03/2010 up to 1200 hrs 16/03/2010 at 1200 hrs 16/03/2010 at 1230 hrs Tk.13,500/- Executive Engineer, E/M Division-I, CAAB
b) O&M of extension terminal building sub-station during the year 2009-2010 (S.H.- Supply of spare & components for 2 nos 600 KVA Powerpac standby engine generator set installed at TB-1 sub-station -do- -do- -do- Tk6,500/- -do-
155X Construction of Box culvert in/c providing divider and other allied works of main approach road at Kurmtiola, R/A Dhaka (S.H.- Construction of pipe culvert in/c providing, divider and other allied works of main approach road at Kurmitola, R/A at HSIA, Kurmitola, Dhaka. 14/03/2010 up to 1200 hrs 16/03/2010 at 1200 hrs 16/03/2010 at 1230 hrs Tk.67,000/- Executive Engineer (CC), On behalf -  Chief Engineer, CAAB
154X Flood protection water supply system in/c Construction of Security fencing at Osmani International Airport, Sylhet (S.H.- Development of Earth work at 11 end of runway) 15/03/2010 during office hrs 18/03/2010 at 1200 hrs 18/03/2010 at 1230 hrs Tk.75,000/- Superintending Engineer (CC), P&D/QS Circle  For- Chief Engineer, CAAB
153X Re-construction of Apron/Construction of Shoulder at North side & Central Taxiway intersection Passenger Apron) at HSIA, Kurmitola, Dhaka 14/03/2010 up to 1200 hrs 16/03/2010 at 1200 hrs 16/03/2010 at 1230 hrs Tk.94,000/- Executive Engineer (CC), For- Chief Engineer, CAAB
152X Repair and maintenance of Shah Amanat International Airport, Chittagong during the year 2009-2010 (S.H.- Supply of Sanitary, hardware and other materials for day to day repair works of residential buildings) 14/03/2010 during office hrs 16/03/2010 at 1200 hrs 16/03/2010 at 1230 hrs Tk.12,500/- Executive Engineer (CC), Civil Division-3, CAAB
151X Repair and maintenance of Osmani International Airport, Sylhet during the year 2009-2010 (S.H.- Supply of Plumbing, Sanitary and Hardware materials for day to day maintenance works) 14/03/2010 during office hrs 16/03/2010 at 1200 hrs 16/03/2010 at 1230 hrs Tk.10,700/- Executive Engineer (CC), Civil Division-3, CAAB
150X Repair and maintenance of Ishurdi Airport during the year 2009-2010 (S.H.- Repair and maintenance of Ansar Barrack in/c other allied works) 14/03/2010 during office hrs 16/03/2010 at 1200 hrs 16/03/2010 at 1230 hrs Tk.6,900/- Executive Engineer (CC), Civil Division-3, CAAB
149X O&M if HSIA, Kurmitola, Dhaka during the year 2009-2010 (S.H.-Renewing brass polis painting bottom of trees, in/c cutting light jungles around VVIP complex and approach road in/c other related works) HSIA, Kurmitola, Dhaka 14/03/2010 up to 1200 hrs 15/03/2010 at 1200 hrs 15/03/2010 at 1230 hrs Tk.5,500/- Executive Engineer, Civil Division-I, CAAB
148X O&M of HSIA, Kurmitola, Dhaka during the year 2009-2010 (S.H.- Essential repairing of damaged road from   BAF south ALPHA towards north from ch +50 to ch 10+50) at HSIA, Kurmitola, Dhaka 14/03/2010 up to 1200 hrs 15/03/2010 at 1200 hrs 15/03/2010 at 1230 hrs Tk.12,500/- Executive Engineer, Civil Division-I, CAAB
147X O&M of HSIA Kurmtiola, Dhaka during the year 2009-2010 (S.H.- Essential repairing of damaged Bituminous pavement surface at South Taxiway Ch.5+68 to Ch.6+68) at HSIA, Kurmitola, Dhaka. 14/03/2010 up to 1200 hrs 15/03/2010 at 1200 hrs 15/03/2010 at 1230 hrs Tk.12,300/- Executive Engineer, Civil Division-I, CAAB
146X R.M.O. E/M works service at Cox's Bazar Airport during the year 2009-2010 (S.H.- Providing and installation of A.C for rest house and other related works) 14/03/2010 during office hrs 16/03/2010 at 1200 hrs 16/03/2010 at 1230 hrs Tk.15,300/- Superintending Engineer (CC), P&D/QS Circle, CAAB
145X Development of Passenger Terminal Building False Ceiling S.S. decorative fencing in/c other allied works (S.H.- Asphalt concrete overlay works at old baggage area South side PTB-2) at HSIA, Kurmitola, Dhaka 18/03/2010 up to 1400 hrs 21/03/2010 at 1200 hrs 21/03/2010 at 1230 hrs Tk.28,000/- Superintending Engineer (CC), Civil Circle, CAAB
144X Development of Passenger Terminal Building False Ceiling S.S. decorative fencing in/c other allied works (S.H.- renewing of S.S. pipe railing of Drive way PTB-1 and North Ramp & other allied works) at HSIA, Kurmitola, Dhaka 14/03/2010 up to 1400 hrs 16/03/2010 at 1200 hrs 16/03/2010 at 1230 hrs Tk.26,000/- Superintending Engineer (CC), Civil Circle, CAAB
143X Operation & Maintenance of  HSIA, Kurmitola Dhaka during the year 2009-2010 (S.H. Extension of existing nursery shed (Green House) of VVIP Terminal Building) HSIA, Kurmitola, Dhaka. 18/03/2010 up to 1400 hrs 21/03/2010 at 1200 hrs 21/03/2010 at 1230 hrs Tk.65,000/- Superintending Engineer (CC), Civil Circle, CAAB
142X Providing and installation of 4.0 KW/KVA 6.6A. CCR of PAPI lighting system with related works at Barisal Airport. 15/03/2010 during office hrs 16/03/2010 at 1200 hrs 16/03/2010 at 1230 hrs Tk.41,500/- Superintending Engineer (CC),  P&D/QS Circle, CAAB.
141X Construction of new residential quarter at Kurmitola, Residential area (Chairman & Member's Banglo, d-type, E-type, F-type, G-type and H-type quarters) (S.H.- construction of interconnection road in between (Group-A-1) to (Group-J-W) for 200 units U-type unclassified quarter at Irshal colony at Kurmitola R/A) at ZIA, Dhaka. 14/03/2010 up to 1200 hrs 16/03/2010 up to 1200 hrs 16/03/2010 at 1530 hrs Tk.5,000/- Superintending Engineer (CC), On behalf of Chief Engineer, CAAB
140X Purchase of office stationary materials for office of the superintending E/M Circle & under its division, E/M Division-I & II 15/03/2010 up to 1700 hrs 16/03/2010 up to 1200 hrs 16/03/2010 at 1230 hrs Tk.5,000/- Superintending Engineer (CC), E/M Circle, CAAB
139X Providing & installation of taxiway directional guidance sign board & runway distance marker i/c other related works of AGL system at Zia International Airport 23/03/2010 up to 1700 hrs 24/03/2010 up to 1200 hrs 24/03/2010 at 1230 hrs Tk.2,00,000/- Superintending Engineer (CC), E/M Circle, , For Chief Engineer, CAAB
138X Expired --- --- --- --- ---
137X Providing fitting, fixing and maintenance of primary RADAR cooling system BC850 of air filter 14/03/2010 during office hrs 15/03/2010 up to 1200 hrs 15/03/2010 at 1230 hrs Tk.3,000/- Director, Zia International Airport, CAAB.
--- Expired from 113X to 136X --- --- --- --- ---
112Xa) O&M of Passenger Escalator at Zia International Airport, Kurmitola, Dhaka during the year 2009-2010 (S.H.- Supply of spare parts for 2 nos. escalator installed at TB-2 Boarding Bridge Holding Lounge Corridor.) 10/03/2010 up to 1200 hrs 11/03/2010 at 1200 hrs 11/03/2010 at 1230 hrs Tk.12,500/- Executive Engineer, E/M Division-I CAAB
b) -do-  (S.H.-Repairing, servicing & painting the Chilled Water pipe, fresh air supply & return duct line at TB-1) -do- -do- -do- Tk12,500/- -do-
c) Providing & fitting/fixing of power socket with necessary wiring i/c other related works at O.C. Building (S.H.-Electrical wiring for A.C. Unit at O.C. Building i/c other related works) -do- -do- -do- Tk 5,000/- -do-
111X Expired  --- --- --- --- ---
110X R.M.O. E/M works service at Osmani International Airport, Sylhet during the year 2009-2010 (S.H.- Providing and installation of security street light at unclassified tin shed area) 09/03/2010 during office hrs 11/03/2010 at 1200 hrs 11/03/2010 at 1230 hrs Tk.7,300/- Executive Engineer, E/M Division-3, CAAB
--- Expired from 106X to 109X --- --- --- --- ---
105X O&M of Exetension Terminal Building sub-station during the year 2009-2010 (S.H.- Providing & installation of standby changover system with connecting cable i/c other related E/M works for 2 nos 500 KVA standby Engine Generating Set at TB-1 Sub-station) 10/03/2010 up to 1200 hrs 11/03/2010 at 1200 hrs 11/03/2010 at 1230 hrs Tk40,000/- Superintending Engineer (CC), E/M Circle, CAAB
104X O&M of Passenger Terminal Building at Zia International Airport, Kurmitola, Dhaka during the yare 2009-2010 09/03/2010 up to 1200 hrs 10/03/2010 at 1200 hrs 10/03/2010 at 1230 hrs - Superintending Engineer (CC), E/M Circle, CAAB

a)

S.H.- Supply of Bracket, Chain Link for Departure Conveyor System at Row-3 -do- -do- -do- Tk25,000/- -do-

b)

S.H- Repairing/replacement of Roller i/c making bush, bearing i/c other related works for Departure Conveyour System -do- -do- -do- Tk15,000/- -do-
CLICK HERE TO GO TOP