Advertisements
| Sl No |
Name of work |
Selling period | Closing date/time | Opening date/time | Security money |
Tenderer |
| 199X | Repair and maintenance of Jessore Airport during the year 2009-2010 (S.H.- re-excavation of kutcha drain at both side of runway) | 21/03/2010 during office hrs | 22/03/2010 at 1200 hrs | 22/03/2010 at 1230 hrs | Tk5,000/- | Executive Engineer, Civil Division-3, CAAB |
| 198X | শাহ্ মখদুম বিমানবব্দর রাজশাহীর রানওয়ের পূর্ব পার্শ্বের ঘাস ও জঙ্গল কেটে পরিষ্কার করন কাজ | 21/03/2010 during office hrs | 22/03/2010 at 1200 hrs | 22/03/2010 at 1230 hrs | Tk1,900/- | Airport Manager, Shah Mukhdum, Rajshahi |
| 197X | R.M.O. E/M works service at Saidpur Airport during the year 2009-2010 (S.H.- Procurement of low pressure and high pressure fittings and spare parts) | 21/03/2010 during office hrs | 22/03/2010 at 1200 hrs | 22/03/2010 at 1230 hrs | Tk5,200/- | Executive Engineer, Civil Division-3, CAAB |
| 196X | Improvement of drainage system at Airside of Hazrat Shahjalal International airport, Re-digging of cannel and leveling dressing from VVIP South side gate towards south up to 1802"-00") at Hazrat Shahjalal International Airport, Dhaka. | 18/03/2010 up to 1200 hrs | 21/03/2010 at 1200 hrs | 21/03/2010 at 1230 hrs | Tk.27,000/- | Superintending Engineer (CC), Civil Circle, CAAB |
| 195X | R.M.O. E/M works service at Shah Mokhdum Airport, Rajshahi during the year 2009-2010 (S.H.-wiring of new guard room of DVOR other related works) | 23/03/2010 during office hrs | 24/03/2010 at 1200 hrs | 24/03/2010 at 1230 hrs | Tk5,000/- | Executive Engineer E/M Division-3, CAAB |
| 194X | Repair and maintenance of Osmani International airport, Sylhet during the year 2009-2010 (S.H.- Emergency work-Kutcha and pucca drain system in/c other allied work passenger terminal building to fire station) | 21/03/2010 during office hrs | 22/03/2010 at 1200 hrs | 22/03/2010 at 1230 hrs | Tk8,500/- | Executive Engineer, Civil Division-3, CAAB |
| 193X | Supply of energy saving Lamp for E/M-I | 28/03/2010 | 29/03/2010 at 1200 hrs | 29/03/2010 at 1215 hrs | Tk5,000/- | Director, CEMSU, CAAB |
| 192X | Development of 400 KVA electrical sub-station, providing and installation of H.T switchgear with related works at Jessore Airport (S.H.- Installation of H.T. Metering panel unit with L.T. P.T. H.T. Cable for HT connection with related works | 21/03/2010 during office hrs | 22/03/2010 at 1200 hrs | 22/03/2010 at 1230 hrs | Tk10,700/- | Executive Engineer E/M Division-3, CAAB |
| 191X | R.M.O. E/M works service at Jessore Airport during the year 2009-2010 (S.H.- Repairing & maintenance of 10 HP water pump and replacement of Auto Starter i/c other works) | 23/03/2010 during office hrs | 24/03/2010 at 1200 hrs | 24/03/2010 at 1230 hrs | Tk2,500/- | Executive Engineer E/M Division-3, CAAB |
| 190X | Supply of Brand New latest model Bus & Microbus for CAAB | 23/03/2010 | 24/03/2010 at 1200 hrs | 24/03/2010 at 1215 hrs | Tk1,40,000/-L-1 Tk1,35,000/-L-2 | Director, CEMSU, CAAB |
| 189X | Construction residential building, School and over head tank in/c E/M work (S.H.- construction of 6 unit G-type quarter at Jessore Airport (Group-B) | 28/03/2010 during office hrs | 30/03/2010 at 1200 hrs | 30/03/2010 at 1230 hrs | Tk1,80,500/- | Superintending Engineer (CC) P&D/QS Circle, For- Chief Engineer, CAAB |
| 188X | Construction residential building, School and over head tank in/c E/M work (S.H.- construction of 6 unit G-type quarter at Jessore Airport (Group-A) | 28/03/2010 during office hrs | 30/03/2010 at 1200 hrs | 30/03/2010 at 1230 hrs | Tk1,80,500/- | Superintending Engineer (CC) P&D/QS Circle, For- Chief Engineer, CAAB |
| 187X | Construction of security wall at both sides of runway at Jessore Airport (S.H.- Construction of Security wall at east side of runway) | 21/03/2010 during office hrs | 25/03/2010 at 1200 hrs | 25/03/2010 at 1230 hrs | Tk4,20,000/- | Superintending Engineer (CC) P&D/QS Circle, For- Chief Engineer, CAAB |
| 186X | R.M.O. E/M works service at Shah Amanat International Airport, Chittagong during the year 2009-2010 (S.H.- Reconstruction of transformer pit & painting of runway lighting system) | 21/03/2010 during office hrs | 22/03/2010 at 1200 hrs | 22/03/2010 at 1230 hrs | Tk5,000/- | Executive Engineer E/M Division-3, CAAB |
| 185X | R.M.O. E/M works service at Osmani International Airport during the year 2009-2010 (S.H.- Rewiring of different types of residential quarter-6 unit P5 quarter (P5 1 to 6) with related works) | 21/03/2010 during office hrs | 22/03/2010 at 1200 hrs | 22/03/2010 at 1230 hrs | Tk6,000/- | Executive Engineer E/M Division-3, CAAB |
| 184X | R.M.O. E/M works service at Jessore Airport during the year 2009-2010 (S.H.-Rewiring of rest house & repairing maintenance of fitting fixture i/c other works) | 24/03/2010 during office hrs | 25/03/2010 at 1200 hrs | 25/03/2010 at 1230 hrs | Tk3,800/- | Executive Engineer E/M Division-3, CAAB |
| 183X |
R.M.O. E/M works service at Barisal Airport during the year 2009-2010 (S.H.- Procurement of 400/90 watt sodium flood light fittings lamp, choke, starter, magnetic contractor etc) |
24/03/2010 during office hrs | 25/03/2010 at 1200 hrs | 25/03/2010 at 1230 hrs | Tk2,500/- | Executive Engineer E/M Division-3, CAAB |
| 182X | R.M.O. E/M works service at Barisal Airport during the year 2009-2010 (S.H.- Procurement and installation of 2 nos split type A/C machine for VVIP and control tower i/c other related works) | 24/03/2010 during office hrs | 25/03/2010 at 1200 hrs | 25/03/2010 at 1230 hrs | Tk7,500/- | Executive Engineer E/M Division-3, CAAB |
| 181X | Repair and maintenance of communication equipment & supply of different type materials for Cox's Bazar Airport | 14/03/2010 up to office hrs | 15/03/2010 at 1200 hrs | 15/03/2010 at 1230 hrs | Tk1,650/- | Airport Manager, Cox's Bazar, CAAB |
| 180X | Expired | --- | --- | --- | --- | --- |
| 179X | হযরত শাহজালাল আন্তর্জাতিক বিমানবন্দরের কাষ্টমস হাউজের পশ্চিম পার্শ্বে কার্গো কার পার্কে প্রবেশকৃত যানবাহনের ফি আদায়ের নিমিত্তে ইজারা গ্রহণে ইচ্ছুক ব্যক্তি/প্রতিষ্ঠান/সংস্থার নিকট হইতে ইজারা দরপত্র আহ্বান করা যাইতেছে | 29/03/2010 up to 1700 hrs | 30/03/2010 at 1200 hrs | 30/03/2010 at 1230 hrs |
10% of the quoted amount per year |
Director (ATS & Aero), CAAB. |
| 178Xa) | R.M.O. Building during the year 2009-2010 (S.H.- Emergency repairing of water service line in/c renovation of sewerage system, pucca surface drain and arboriculture work to flower garden area of CATC Principal office building & otherallied works) at Hazrat Shahjalal International Airport, Kurmitola, Dhaka. | 18/03/2010 up to 1200 hrs | 21/03/2010 at 1200 hrs | 21/03/2010 at 1230 hrs | Tk25,000/- | Superintending Engineer (CC), Civil Circle, CAAB |
| b) | -do- (S.H.- Providing garden bed in/c beautification and other allied works to west side of CATC Principal office) at Hazrat Shahjalal International Airport, Kurmitola, Dhaka. | -do- | -do- | -do- | Tk13,500/- | -do- |
| 177X | R.M.O. Building during the year 2009-2010 (S.H.-Renovation of main gate and car park to south side of CATC Zam-e-mosque) at Hazrat Shahjalal International Airport, Kurmitola, Dhaka. | 23/03/2010 up to 1200 hrs | 25/03/2010 at 1200 hrs | 25/03/2010 at 1230 hrs | Tk25,000/- | Superintending Engineer (CC) Civil Circle, CAAB |
| 176X | Improvement of drainage system airside of Hazrat Shahjalal International Airport. Re-diggining of cannel and leveling dressing from Cargo village entry gate towards west up to north taxiway) at HSIA, Kurmitola, Dhaka | 21/03/2010 up to 1200 hrs | 23/03/2010 at 1200 hrs | 23/03/2010 at 1230 hrs | Tk26,000/- | Superintending Engineer (CC) Civil Circle, CAAB |
| 175X | Re-construction of Apron at Hazrat Shahjalal International Airport (S.H.-Re-construction of damaged slab of Passenger Apron Bay no02 front side) at HSIA, Kurmitola, Dhaka | 25/03/2010 up to 1200 hrs | 28/03/2010 at 1200 hrs | 28/03/2010 at 1230 hrs | Tk1,85,000/- | Md. Shahidul Afroz, For Chief Engineer, CAAB |
| 174X | Re-construction of Apron at Hazrat Shahjalal International Airport (S.H.-Re-construction of damaged slab of Passenger Apron in between Bay no08 and Bay no 09 front side) at HSIA, Kurmitola, Dhaka | 25/03/2010 up to 1200 hrs | 28/03/2010 at 1200 hrs | 28/03/2010 at 1230 hrs | Tk2,75,000/- | Md. Shahidul Afroz, For Chief Engineer, CAAB |
| 173X | R.M.O. Building during the year 2009-2010 (S.H.-Essential repair & maintenance of boundary wall with providing M.S. grill in front side of CATC Admin complex building) at Hazrat Shahjalal International Airport, Kurmtiola, Dhaka | 18/03/2010 up to 1200 hrs | 21/03/2010 at 1200 hrs | 21/03/2010 at 1230 hrs | Tk25,000/- | Superintending Engineer (CC), Civil Circle, CAAB |
| 172X | Auction sale of different type of un-serviceable vehicles (Jeep, Bus etc) | 15/03/2010 during office hrs | 16/03/2010 at 1200 hrs | 16/03/2010 at 1215 hrs |
10% of the quoted auction value |
Executive Engineer (CC), Civil Division-3, CAAB |
| 171X | Repair and maintenance of Shah Makhdum Airport, Rajshahi during the year 2009-2010 (S.H.- Repairing & Maintenance of Anser Barrack) | 17/03/2010 during office hrs | 18/03/2010 at 1200 hrs | 18/03/2010 at 1230 hrs | Tk5,100/- | Executive Engineer (CC), Civil Division-3, CAAB |
| 170X | Repair and Maintenance of Shah Makhdum Airport, Rajshahi during the year 2009-2010 (S.H.- Repairing painting and maintenance of passenger terminal building in/c other allied works) | 17/03/2010 during office hrs | 18/03/2010 at 1200 hrs | 18/03/2010 at 1230 hrs | Tk8,500/- | Executive Engineer (CC), Civil Division-3, CAAB |
| 169X | O&M of B&R work services at Shah Makhdum Airport, Rajshahi during the year 2009-2010(S.H.- Providing walkway from Passenger Terminal Building to NDB in/c other allied works) | 17/03/2010 during office hrs | 18/03/2010 at 1200 hrs | 18/03/2010 at 1230 hrs | Tk2,500/- | Executive Engineer (CC), Civil Division-3, CAAB |
| 168X | Providing & Installation of major spare parts of conveyor belt & weighing scale (S.H.-Providing & installation of 2 nos, carousel conveyor belt at Shah Amanat International Airport, Chittagong) | 15/04/2010 | 15/04/2010 at 1200 hrs | 18/04/2010 at 1230 hrs | US$13,600.00 | Superintending Engineer (CC), P&D/QS Circle For- Chief Engineer, CAAB |
| 167X | R.M.O. E/M works service at Cox's Bazar Airport during the year 2009-2010 (S.H.- Providing and installation of 90 watt LP Sodium street light with pole, LT/UG Cable with related work from power house panel to Approach road NDB Hut area) | 23/03/2010 during office hrs | 24/03/2010 at 1200 hrs | 24/03/2010 at 1230 hrs | Tk2,700/- | Executive Engineer, E/M Division-3, CAAB |
| 166X | R.M.O. E/M works service at Jessore Airport during the year 2009-2010 (S.H.- Procurement of different types of Lamps for Air Field lighting system) | 24/03/2010 during office hrs | 25/03/2010 at 1200 hrs | 25/03/2010 at 1230 hrs | Tk7,500/- | Executive Engineer, E/M Division-3, CAAB |
| 165X | R.M.O. E/M Works service at Jessore Airport during the year 2009-2010 (S.H.-Providing & installation of window air-condition machine for VOR, NDB & ECR i/c other air-condition unit servicing, repairing maintenance works) | 23/03/2010 during office hrs | 24/03/2010 at 1200 hrs | 24/03/2010 at 1230 hrs | Tk.3,800/- | Executive Engineer E/M Division-3, CAAB |
| 164X | R.M.O. E/M works service at Osmani International Airport, Sylhet during the year 2009-2010 (S.H.- Supply of Battery, Battery charger and different types of tools for engine generating sets) | 24/03/2010 during office hrs | 25/03/2010 at 1200 hrs | 25/03/2010 at 1230 hrs | Tk7,000/- | Executive Engineer, E/M Division-3, CAAB |
| 163X | Development of passenger Terminal Building (S.H.- Renovation of Gents & Ladies toilets Ground floor custom hall (South side) PTB-1) at Hazrat Shahjal International Airport, Dhaka | 28/03/2010 up to 1200 hrs | 31/03/2010 at 1200 hrs | 31/03/2010 at 1230 hrs | Tk80,000/- | Executive Engineer (Civil), For Chief Engineer, CAAB |
| 162X | Repair and maintenance of Shah Amanat International Airport, Chittagong during the year 2009-2010-Repair and maintenance of operational road, drainage system, culvert, dressing, leveling (S.H.- Repair and maintenance of Road from gate no 13 to runway-23 end inter section and gate no 13 to Airport maintenance building in/c | 23/03/2010 during office hrs | 25/03/2010 at 1200 hrs | 25/03/2010 at 1230 hrs | Tk23,000/- | Superintending Engineer (CC), P&D/QS Circle CAAB |
|
161X |
Supply of different type of Air-conditioning Unit for different Airports | 15/03/2010 | 16/03/2010 at 1200 hrs | 16/03/2010 at 1215 hrs | Tk 40,000/- | Director, CEMSU, CAAB |
| 160Xa) | O&M of E/M works services at Hazrat Shahjalal International Airport, Dhaka during the year 2009-2010 (S.H.- supply of runway edge elevated type ZA151 light fittings) | 15/03/2010 up to 1200 hrs | 16/03/2010 at 1200 hrs | 16/03/2010 at 1230 hrs | Tk 9,000/- | Executive Engineer, E/M Division-II, CAAB |
| b) | -do-(S.H.- Emergency unseen supply/work-Supply of consumable materials & Low Pressure Sodium Lamp & other spare for Middle Marker & NDB Area at HSIA) | -do- | -do- | -do- |
Tk.8,000/- |
-do- |
| c) | -d0-(S.H.- Supply of magnetic Contactor, module etc. at Transmitting station) | -do- | -do- | -do- | Tk8,000/- | -do- |
| d) | -do-(S.H.-Supply of Switch socket, bulb, holder, fan capacitor, fan bearing, circuit breaker, consumables etc. at Tejgaon, Banani R/A & other station) | -do- | -do- | -do- | Tk5,500/- | -do- |
| e) | -do- (S.H.- Raising the Taxiway Stop bar Light fittings base i/c fitting/fixing & other related works) | -do- | -do- | -do- | Tk4,500/- | -do- |
| 159X | Construction of new residential quarters (Chairman & Member's Banglo), D-type, E-type, F-type & H-type quarters (S.H.-Construction of 200 uits U-type Semi-pucca unclassified quarters at Irshal Colony, Kurmtiola, Group-2 nos. Building -8-Units - Internal electrification works of Group P+ R+ S) | 23/03/2010 up to 1200 hrs | 24/03/2010 at 1200 hrs | 25/03/2010 at 1230 hrs | Tk 22,500/- | Superintending Engineer (CC), E/M Circle, CAAB |
| 158Xa) | O&M of E/M work services at Hazrat Shahjalal International Airport, Dhaka during the year 2009-2010 (S.H.- Supply of 200 watt & 100 watt 6.6 amps T.H Lamp for runway, H.I. & Supplementary Approach & Wing bar Threshold Lighting System) | 16/03/2010 up to 1200 hrs | 18/03/2010 at 1200 hrs | 18/03/2010 at 1230 hrs | Tk8,500/- | Executive Engineer, E/M Division-II, CAAB |
| b) | -do-( S.H.- Repairing of light base anchor nuts bolts for fixing up the security case over the Isolating Transformer pit of runway lighting system) | -do- | -do- | -do- | Tk 7,000/- | -do- |
| c) | -do- (S.H.- Supply of Consumable materials for runway lighting system) | -do- | -do- | -do- | Tk 4,000/- | -do- |
| 157Xa) | O&M of E/M work services at Hazrat Shahjalal International Airport, Dhaka during the year 2009-2010 (S.H.- Supply, installation, testing & commissioning of 250KVA Automatic Voltage Stabilizer (AVR) in the submersible water pump house installed at BFC area i/c other related works) | 16/03/2010 up to 1200 hrs | 18/03/2010 at 1200 hrs | 18/03/2010 at 1230 hrs | Tk25,000/- | Superintending Engineer (CC), E/M Circle, CAAB |
| b) | -do- (S.H.- Repairing / servicing of 100KVA Disel Engine Generating set at Transmitting Station Power House) | -do- | -do- | -do- | Tk21,000/- | -do- |
| 156Xa) | O&M of Passenger Terminal Building-1 & Domestic T/B at Hazrat Shahjalal International Airport, Dhaka during the year 2009-2010 (S.H.-Repairing & replacement of double tube light fittings i/c related works at Domestic T/B & TB-1 | 15/03/2010 up to 1200 hrs | 16/03/2010 at 1200 hrs | 16/03/2010 at 1230 hrs | Tk.13,500/- | Executive Engineer, E/M Division-I, CAAB |
| b) | O&M of extension terminal building sub-station during the year 2009-2010 (S.H.- Supply of spare & components for 2 nos 600 KVA Powerpac standby engine generator set installed at TB-1 sub-station | -do- | -do- | -do- | Tk6,500/- | -do- |
| 155X | Construction of Box culvert in/c providing divider and other allied works of main approach road at Kurmtiola, R/A Dhaka (S.H.- Construction of pipe culvert in/c providing, divider and other allied works of main approach road at Kurmitola, R/A at HSIA, Kurmitola, Dhaka. | 14/03/2010 up to 1200 hrs | 16/03/2010 at 1200 hrs | 16/03/2010 at 1230 hrs | Tk.67,000/- | Executive Engineer (CC), On behalf - Chief Engineer, CAAB |
| 154X | Flood protection water supply system in/c Construction of Security fencing at Osmani International Airport, Sylhet (S.H.- Development of Earth work at 11 end of runway) | 15/03/2010 during office hrs | 18/03/2010 at 1200 hrs | 18/03/2010 at 1230 hrs | Tk.75,000/- | Superintending Engineer (CC), P&D/QS Circle For- Chief Engineer, CAAB |
| 153X | Re-construction of Apron/Construction of Shoulder at North side & Central Taxiway intersection Passenger Apron) at HSIA, Kurmitola, Dhaka | 14/03/2010 up to 1200 hrs | 16/03/2010 at 1200 hrs | 16/03/2010 at 1230 hrs | Tk.94,000/- | Executive Engineer (CC), For- Chief Engineer, CAAB |
| 152X | Repair and maintenance of Shah Amanat International Airport, Chittagong during the year 2009-2010 (S.H.- Supply of Sanitary, hardware and other materials for day to day repair works of residential buildings) | 14/03/2010 during office hrs | 16/03/2010 at 1200 hrs | 16/03/2010 at 1230 hrs | Tk.12,500/- | Executive Engineer (CC), Civil Division-3, CAAB |
| 151X | Repair and maintenance of Osmani International Airport, Sylhet during the year 2009-2010 (S.H.- Supply of Plumbing, Sanitary and Hardware materials for day to day maintenance works) | 14/03/2010 during office hrs | 16/03/2010 at 1200 hrs | 16/03/2010 at 1230 hrs | Tk.10,700/- | Executive Engineer (CC), Civil Division-3, CAAB |
| 150X | Repair and maintenance of Ishurdi Airport during the year 2009-2010 (S.H.- Repair and maintenance of Ansar Barrack in/c other allied works) | 14/03/2010 during office hrs | 16/03/2010 at 1200 hrs | 16/03/2010 at 1230 hrs | Tk.6,900/- | Executive Engineer (CC), Civil Division-3, CAAB |
| 149X | O&M if HSIA, Kurmitola, Dhaka during the year 2009-2010 (S.H.-Renewing brass polis painting bottom of trees, in/c cutting light jungles around VVIP complex and approach road in/c other related works) HSIA, Kurmitola, Dhaka | 14/03/2010 up to 1200 hrs | 15/03/2010 at 1200 hrs | 15/03/2010 at 1230 hrs | Tk.5,500/- | Executive Engineer, Civil Division-I, CAAB |
| 148X | O&M of HSIA, Kurmitola, Dhaka during the year 2009-2010 (S.H.- Essential repairing of damaged road from BAF south ALPHA towards north from ch +50 to ch 10+50) at HSIA, Kurmitola, Dhaka | 14/03/2010 up to 1200 hrs | 15/03/2010 at 1200 hrs | 15/03/2010 at 1230 hrs | Tk.12,500/- | Executive Engineer, Civil Division-I, CAAB |
| 147X | O&M of HSIA Kurmtiola, Dhaka during the year 2009-2010 (S.H.- Essential repairing of damaged Bituminous pavement surface at South Taxiway Ch.5+68 to Ch.6+68) at HSIA, Kurmitola, Dhaka. | 14/03/2010 up to 1200 hrs | 15/03/2010 at 1200 hrs | 15/03/2010 at 1230 hrs | Tk.12,300/- | Executive Engineer, Civil Division-I, CAAB |
| 146X | R.M.O. E/M works service at Cox's Bazar Airport during the year 2009-2010 (S.H.- Providing and installation of A.C for rest house and other related works) | 14/03/2010 during office hrs | 16/03/2010 at 1200 hrs | 16/03/2010 at 1230 hrs | Tk.15,300/- | Superintending Engineer (CC), P&D/QS Circle, CAAB |
| 145X | Development of Passenger Terminal Building False Ceiling S.S. decorative fencing in/c other allied works (S.H.- Asphalt concrete overlay works at old baggage area South side PTB-2) at HSIA, Kurmitola, Dhaka | 18/03/2010 up to 1400 hrs | 21/03/2010 at 1200 hrs | 21/03/2010 at 1230 hrs | Tk.28,000/- | Superintending Engineer (CC), Civil Circle, CAAB |
| 144X | Development of Passenger Terminal Building False Ceiling S.S. decorative fencing in/c other allied works (S.H.- renewing of S.S. pipe railing of Drive way PTB-1 and North Ramp & other allied works) at HSIA, Kurmitola, Dhaka | 14/03/2010 up to 1400 hrs | 16/03/2010 at 1200 hrs | 16/03/2010 at 1230 hrs | Tk.26,000/- | Superintending Engineer (CC), Civil Circle, CAAB |
| 143X | Operation & Maintenance of HSIA, Kurmitola Dhaka during the year 2009-2010 (S.H. Extension of existing nursery shed (Green House) of VVIP Terminal Building) HSIA, Kurmitola, Dhaka. | 18/03/2010 up to 1400 hrs | 21/03/2010 at 1200 hrs | 21/03/2010 at 1230 hrs | Tk.65,000/- | Superintending Engineer (CC), Civil Circle, CAAB |
| 142X | Providing and installation of 4.0 KW/KVA 6.6A. CCR of PAPI lighting system with related works at Barisal Airport. | 15/03/2010 during office hrs | 16/03/2010 at 1200 hrs | 16/03/2010 at 1230 hrs | Tk.41,500/- | Superintending Engineer (CC), P&D/QS Circle, CAAB. |
| 141X | Construction of new residential quarter at Kurmitola, Residential area (Chairman & Member's Banglo, d-type, E-type, F-type, G-type and H-type quarters) (S.H.- construction of interconnection road in between (Group-A-1) to (Group-J-W) for 200 units U-type unclassified quarter at Irshal colony at Kurmitola R/A) at ZIA, Dhaka. | 14/03/2010 up to 1200 hrs | 16/03/2010 up to 1200 hrs | 16/03/2010 at 1530 hrs | Tk.5,000/- | Superintending Engineer (CC), On behalf of Chief Engineer, CAAB |
| 140X | Purchase of office stationary materials for office of the superintending E/M Circle & under its division, E/M Division-I & II | 15/03/2010 up to 1700 hrs | 16/03/2010 up to 1200 hrs | 16/03/2010 at 1230 hrs | Tk.5,000/- | Superintending Engineer (CC), E/M Circle, CAAB |
| 139X | Providing & installation of taxiway directional guidance sign board & runway distance marker i/c other related works of AGL system at Zia International Airport | 23/03/2010 up to 1700 hrs | 24/03/2010 up to 1200 hrs | 24/03/2010 at 1230 hrs | Tk.2,00,000/- | Superintending Engineer (CC), E/M Circle, , For Chief Engineer, CAAB |
| 138X | Expired | --- | --- | --- | --- | --- |
| 137X | Providing fitting, fixing and maintenance of primary RADAR cooling system BC850 of air filter | 14/03/2010 during office hrs | 15/03/2010 up to 1200 hrs | 15/03/2010 at 1230 hrs | Tk.3,000/- | Director, Zia International Airport, CAAB. |
| --- | Expired from 113X to 136X | --- | --- | --- | --- | --- |
| 112Xa) | O&M of Passenger Escalator at Zia International Airport, Kurmitola, Dhaka during the year 2009-2010 (S.H.- Supply of spare parts for 2 nos. escalator installed at TB-2 Boarding Bridge Holding Lounge Corridor.) | 10/03/2010 up to 1200 hrs | 11/03/2010 at 1200 hrs | 11/03/2010 at 1230 hrs | Tk.12,500/- | Executive Engineer, E/M Division-I CAAB |
| b) | -do- (S.H.-Repairing, servicing & painting the Chilled Water pipe, fresh air supply & return duct line at TB-1) | -do- | -do- | -do- | Tk12,500/- | -do- |
| c) | Providing & fitting/fixing of power socket with necessary wiring i/c other related works at O.C. Building (S.H.-Electrical wiring for A.C. Unit at O.C. Building i/c other related works) | -do- | -do- | -do- | Tk 5,000/- | -do- |
| 111X | Expired | --- | --- | --- | --- | --- |
| 110X | R.M.O. E/M works service at Osmani International Airport, Sylhet during the year 2009-2010 (S.H.- Providing and installation of security street light at unclassified tin shed area) | 09/03/2010 during office hrs | 11/03/2010 at 1200 hrs | 11/03/2010 at 1230 hrs | Tk.7,300/- | Executive Engineer, E/M Division-3, CAAB |
| --- | Expired from 106X to 109X | --- | --- | --- | --- | --- |
| 105X | O&M of Exetension Terminal Building sub-station during the year 2009-2010 (S.H.- Providing & installation of standby changover system with connecting cable i/c other related E/M works for 2 nos 500 KVA standby Engine Generating Set at TB-1 Sub-station) | 10/03/2010 up to 1200 hrs | 11/03/2010 at 1200 hrs | 11/03/2010 at 1230 hrs | Tk40,000/- | Superintending Engineer (CC), E/M Circle, CAAB |
| 104X | O&M of Passenger Terminal Building at Zia International Airport, Kurmitola, Dhaka during the yare 2009-2010 | 09/03/2010 up to 1200 hrs | 10/03/2010 at 1200 hrs | 10/03/2010 at 1230 hrs | - | Superintending Engineer (CC), E/M Circle, CAAB |
|
a) |
S.H.- Supply of Bracket, Chain Link for Departure Conveyor System at Row-3 | -do- | -do- | -do- | Tk25,000/- | -do- |
|
b) |
S.H- Repairing/replacement of Roller i/c making bush, bearing i/c other related works for Departure Conveyour System | -do- | -do- | -do- | Tk15,000/- | -do- |
| CLICK HERE TO GO TOP | ||||||